Plasma Projects

Bathroom Project A

This client called to fit a tv in the bathroom, but we were asked if we could complete the whole bathroom as they wanted it to look like one of our installs. The whole bathroom was completely gutted (including the two layers of tiles) All pipework was reconfigured. We fitted a new bath with control fittings in the wall. New walk in shower, again with control fittings in the wall, sink and cupboard. Tv was installed flush in the wall, the mirror over sink also flush in the wall (looks like it was born there!) Alcoves finished with mitred stainless steel, and made to measure glass shelves inset. We tiled the walls, floor and bath panel to give a minimal continuous look. Such a clean modern look with everything needed seamlessly incorporated.

image_a image_b image_c image_d image_e image_f image_g image_h
Techsyte